v.26.8.0.7

Estimated reading: 3 minutes

This release introduces enhancements, and bug fixes across multiple areas of the platform.

Prerequisites: Cache must be cleared once after deployment to ensure Robility Manager functions as expected.

Enhancements

1. License Expiry Notification
Enhanced the License Expiry Notification modal to provide direct navigation to the License Request and License Renewal pages, enabling quicker access to license management actions.

2. Admin Console

a. Migration to Project Layer
Migrated the Admin Console implementation from the Tenant layer to the Project layer. Integrated Admin Console functionality within the Project layer in the Automation Ops page, improving project-level operational management capabilities.

b. UI Enhancements
Redesigned the Admin Console interface by replacing the partial-view slider with a modal popup, delivering a more streamlined and user-friendly experience.

c. PDF Export for Command
Added PDF export functionality for the Top Process and Running Process modal popups within Admin Console command views, allowing users to easily download and share process details.

3. Scheduler – Time-Based Execution
Added support for a new Execution Type field in the Time-Based Scheduler, allowing users to choose between Parallel and Sequential processing. Parallel execution now includes configurable Execution Count and Retry Count, enabling automatic retries of failed queue items within the scheduled window, while Sequential execution processes items one after another in order.

Limitation: Parallel execution supports a maximum of 40 concurrent executions at a time.
 

Bug Fix

Interact

1. Fixed an issue where uploaded attachments were not visible on the Interact Review page for specific projects despite being successfully saved. Enhanced the file loading logic to ensure attachments are retrieved and displayed correctly across projects

2. Fixed an issue where items were not moved to the Completed queue when a business rule was configured with the “Empty” Updated the rule evaluation logic to correctly identify fields with no value and execute the configured queue transition.

Known Issue 

1. Time-Based Scheduler: Retry functionality is currently not working for workflows configured with the Advanced Time-Based Scheduler.

Existing Limitations

1. When the storage type is set to Local Storage in the Storage tab, workflows larger than 60 MB cannot be downloaded using RunnerApi.
2. The Priority field is currently visible only in the Queues tab and is not yet available in other Interact menus, such as URN Management or Reports.
3. The user limit in Machine Templates is currently restricted to 200 users per machine template. This limit will be increased in a future release.
4. The asset text limit has been increased to 20,000 characters on the Manager side; however, the Activity side does not yet support this limit.
5. Microsoft O365:Access tokens are valid for one hour. After expiration, OAuthconnections can automatically obtain a new access token using the refresh token, while Client Credentials connections must be reconnected manually.

Release Date: 29.08.2026

Share this Doc

v.26.8.0.7

Or copy link

CONTENTS
Robility Chatbot
Robility Assistant
Online