v.26.11.0.6

Estimated reading: 3 minutes

This release introduces new features, enhancements, and bug fixes across multiple areas of the platform.

Prerequisites

1. Clear the cache once after deployment to ensure Robility Manager functions as expected.

New Features

1. Webex Integration – Notifications

Introduced Webex-based notification capabilities to proactively alert configured users about upcoming license expirations. A new Enable/Disable Webex Notifications option has been added to Project Configuration, allowing administrators to control notification delivery.

2. Gmail Integration

Gmail integration is now available on the Robility platform. Use the Google Gmail API in automation workflows to send, read, search, reply to, and manage emails. Secure OAuth 2.0 authentication protects account access and follows Google’s authorization standards.

Enhancements

1. LLM Configuration

The LLM Configuration screen now provides a smoother and more transparent setup experience:

i. Model ID Display: After credentials are successfully validated and authenticated, the Model ID is now displayed in the UI, confirming that the intended model is connected.
ii. Deployment Name-Based Model Loading: Model IDs are now loaded based on the specified deployment name, making it easier to select the correct model for a given deployment.
iii. vLLM Support: LLM configuration now supports vLLM providers, allowing models served through vLLM to be configured and used in the same way as other supported providers.

2. Redesigned Pages

i. Sign-In Page: Refreshed the sign-in flow with a clearer layout, smoother navigation, and better accessibility so users can log in and get started with less friction.
ii. Tenant Selection: Reimagined the Select a tenant workspace so you can spot, filter, and launch the right tenant in fewer clicks using instant search, status and organization filters, and Ask Robility prompts

Limitation

Parallel Execution for scheduler

a. A maximum of 40 items can be processed in parallel per execution. Parallel execution runs only once per scheduled run. Any remaining items are not processed automatically, even if execution time is still available.
b. If more than 40 items need to be processed, configure Daily Multiple schedules or create additional scheduled runs to process the remaining items.

Known Issues

1. Advanced Time-Based Scheduler: The Retry functionality is currently not working for workflows configured with the Advanced Time-Based Scheduler.
2. Scheduler: If a process is stopped and then run again from the Scheduler, items marked as To Check will also run.

Existing Limitations

1. Runner API – Local Storage: When the storage type is set to Local Storage in the Storage tab, workflows larger than 60 MB cannot be downloaded using the Runner API.
2. Priority Field in Interact: The Priority field is currently available only in the Queues tab. It is not yet available in other Interact menus, such as URN Management and Reports.
3. Machine Templates: The user limit is currently restricted to 200 users per machine template. This limit is expected to be increased in a future release.
4. Asset Text Limit: The asset text limit has been increased to 20,000 characters on the Manager side. However, the Activity side does not yet support this limit.
5. Microsoft O365 Token Expiration: Access tokens are valid for one hour. OAuth connections can automatically obtain a new access token using the refresh token after expiration, whereas Client Credentials connections must be reconnected manually.

Release Date:28.11.2026

Share this Doc

v.26.11.0.6

Or copy link

CONTENTS
Robility Chatbot
Robility Assistant
Online